LC Type Vertical Long Shaft Pump Shutdown

 The vertical turbine pump     |      2022-07-16 21:48:29

LC Type Vertical Long Shaft Pump Shutdown


(1) Close the pressure gauge cock. Close the gate valve on the outlet pipe of the vertical long shaft pump.

(2) Cut off the power supply and turn off the cooling water when the LC vertical long-axis pump stops turning completely.